Fabrication & installation

Prepared for the opening. Planned for the site.

GP coordinates measurement, fabrication and installation around the agreed project requirements.

Request a quote
A Nigerian installer checks a charcoal aluminium window frame with a spirit level.

How the work moves.

The exact sequence depends on the project, access and approved quotation.

  1. 01

    Project review

    GP reviews the building type, openings, available schedules and intended use.

  2. 02

    Measurement

    Measurements are confirmed before the fabrication scope and quotation are finalised.

  3. 03

    System recommendation

    A suitable starting system is proposed, subject to current technical confirmation.

  4. 04

    Fabrication planning

    The approved work is organised around materials, quantities and the project sequence.

  5. 05

    Fabrication

    The aluminium work is prepared to the confirmed measurements and agreed scope.

  6. 06

    Installation and handover

    Installation is coordinated with the site team before the completed scope is handed over.

Plan detailed and repeated work.

Discuss the number of openings, site access and installation sequence with GP before agreeing a fabrication programme.

Bring the measurements and schedule.

GP can start with drawings, an opening schedule or a site-measurement requirement.

Prepare an enquiry